James QX5CS Käyttöohje
Lue alta 📖 käyttöohje suomeksi merkille James QX5CS (2 sivua) kategoriassa Kaiutin. Tämä opas oli hyödyllinen 30 henkilölle ja sai 4.4 tähden keskimäärin 15.5 käyttäjältä
Sivu 1/2

PBF Pre-construction Board Installation guide
PBF (
FLUSH
) PRE-CONSTRUCTION BOARD INSTALLATION GUIDE
Before installing the PBF pre-construction board,
we recommend securing two horizontal studs, at
PBF board height, between the vertical studs of
the chosen installation location to add additional
support.
1
2
Measure the PBF board and make an outline of the
board on a new panel of sheet rock.
4
3
After this has been done, ensure that the
board is level before fully securing it to the
wall studs.
Lay the frame panel of sheet rock over the PBF
board and fasten the frame to studs of the wall.
6
5
Cut along the traced path to make a frame for
the pre-construction board.
Once the board has been properly leveled, fasten
the PBF board to the vertical and horizontal studs.
Tuotetiedot
| Merkki: | James |
| Kategoria: | Kaiutin |
| Malli: | QX5CS |
Tarvitsetko apua?
Jos tarvitset apua merkille James QX5CS esitä kysymys alla ja muut käyttäjät vastaavat sinulle
Kaiutin James Käyttöohjeet
3 Tammikuuta 2025
3 Tammikuuta 2025
3 Tammikuuta 2025
3 Tammikuuta 2025
3 Tammikuuta 2025
3 Tammikuuta 2025
3 Tammikuuta 2025
3 Tammikuuta 2025
3 Tammikuuta 2025
3 Tammikuuta 2025
Kaiutin Käyttöohjeet
- Yamazen
- Fresh N Rebel
- ILive
- Kalley
- Heco
- OWI
- Kanto
- OSD Audio
- Metra
- Bauhn
- Atlas Sound
- ESX
- M-Audio
- Urban Revolt
- Eve Audio
Viimeisimmät Kaiutin Käyttöohjeet
8 Huhtikuuta 2025
8 Huhtikuuta 2025
8 Huhtikuuta 2025
7 Huhtikuuta 2025
7 Huhtikuuta 2025
7 Huhtikuuta 2025
5 Huhtikuuta 2025
3 Huhtikuuta 2025
3 Huhtikuuta 2025
3 Huhtikuuta 2025