Apc GVSBPIT50 Käyttöohje

Apc Ei luokiteltu GVSBPIT50

Lue alta 📖 käyttöohje suomeksi merkille Apc GVSBPIT50 (14 sivua) kategoriassa Ei luokiteltu. Tämä opas oli hyödyllinen 30 henkilölle ja sai 3.9 tähden keskimäärin 15.5 käyttäjältä

Sivu 1/14
Galaxy VS
Maintenance Bypass Cabinet with Input/Output
Transformer
Installation
GVSBPIT25, GVSBPIT50, GVSBPIT75, GVSBPOT50, GVSBPOT100, GVSBPOT150
1/2020
www.schneider-electric.com
Legal Information
The Schneider Electric brand and any trademarks of Schneider Electric SE and its
subsidiaries referred to in this guide are the property of Schneider Electric SE or its
subsidiaries. All other brands may be trademarks of their respective owners.
This guide and its content are protected under applicable copyright laws and
furnished for informational use only. No part of this guide may be reproduced or
transmitted in any form or by any means (electronic, mechanical, photocopying,
recording, or otherwise), for any purpose, without the prior written permission of
Schneider Electric.
Schneider Electric does not grant any right or license for commercial use of the guide
or its content, except for a non-exclusive and personal license to consult it on an "as
is" basis. Schneider Electric products and equipment should be installed, operated,
serviced, and maintained only by qualified personnel.
As standards, specifications, and designs change from time to time, information
contained in this guide may be subject to change without notice.
To the extent permitted by applicable law, no responsibility or liability is assumed by
Schneider Electric and its subsidiaries for any errors or omissions in the informational
content of this material or consequences arising out of or resulting from the use of the
information contained herein.
Go to
https://www.productinfo.schneider-electric.com/portals/ui/galaxyvs_ul/
or scan the QR code above for digital experience and translated manuals.
Maintenance Bypass Cabinet with Input/Output Transformer
Table of Contents
Important Safety Instructions SAVE THESE
INSTRUCTIONS
.........................................................................................5
FCC Statement ..........................................................................................6
Safety Precautions .....................................................................................6
Additional Safety Precautions After Installation........................................8
Electrical Safety .........................................................................................8
Battery Safety ............................................................................................9
Specifications ............................................................................................10
Specifications for Maintenance Bypass Cabinet with Input Transformer
(GVSBPIT25, GVSBPIT50, GVSBPIT75) ...................................................10
Trip Settings for Maintenance Bypass Cabinet with Input
Transformer........................................................................................10
Recommended Upstream Protection for Maintenance Bypass
Cabinet with Input Transformer ............................................................ 11
Recommended Cable Sizes for Maintenance Bypass Cabinet with
Input Transformer ...............................................................................12
Specifications for Maintenance Bypass Cabinet with Output Transformer
(GVSBPOT50, GVSBPOT100, GVSBPOT150) ..........................................13
Trip Settings for Maintenance Bypass Cabinet with Output
Transformer........................................................................................13
Recommended Upstream Protection for Maintenance Bypass
Cabinet with Output Transformer..........................................................14
Recommended Cable Sizes for Maintenance Bypass Cabinet with
Output Transformer.............................................................................14
Recommended Bolt and Lug Sizes ............................................................16
Torque Specifications................................................................................17
Maintenance Bypass Cabinet with Transformer Weights and
Dimensions..............................................................................................17
Clearance ................................................................................................18
Environment.............................................................................................18
System Overview .....................................................................................19
Installation Procedure ..............................................................................20
Receiving ...................................................................................................21
Unpack the Maintenance Bypass Cabinet ............................................22
Prepare the Maintenance Bypass Cabinet for Cables ........................25
Install the Seismic Anchoring (Option) ..................................................27
Interconnect the UPS and the Maintenance Bypass Cabinet ............29
Connect the Power Cables in a Maintenance Bypass Cabinet
with Input Transformer
.............................................................................33
Connect the Power Cables in a Maintenance Bypass Cabinet
with Output Transformer
..........................................................................34
Connect the Signal Cables ......................................................................35
Final Installation ........................................................................................37
990-91138A-001 3

Tuotetiedot

Merkki: Apc
Kategoria: Ei luokiteltu
Malli: GVSBPIT50

Tarvitsetko apua?

Jos tarvitset apua merkille Apc GVSBPIT50 esitä kysymys alla ja muut käyttäjät vastaavat sinulle